Policy: Mitigation, No 2

Individual compensatory mitigation projects should be sited and designed within a Baywide ecological context, as close to the impact site as practicable, to: (1) compensate for the adverse impacts; (2) ensure a high likelihood of long-term ecological success; and (3) support the improved health of the Bay ecological system. Determination of the suitability of proposed mitigation locations should be guided in part by the information provided in the Baylands Ecosystem Habitat Goals report.

Plan Section: